TemplateNotices & ClaimsNHAI GCC Cl. 19 / FIDIC 19.2Word format

Force Majeure Notice

Force majeure declaration citing Cl. 19. Documents the FM event (natural disaster, pandemic, government act), its impact on construction, and contractor's mitigation steps.

Template in preparation. Coming soon.

When to use this letter

Within the notice window prescribed by Cl. 19 of NHAI GCC or 19.2 of FIDIC. Late FM notices are the most common reason valid pandemic and flood claims were rejected in 2020-2023.

What's inside

  • FM event description with onset date and continuing nature
  • Cl. 19 / 19.2 specific limb invoked
  • Direct impact on work, supply chain, and labour
  • Mitigation steps already taken with cost
  • Expected duration and notification of further updates
  • Reservation of cost and time claim rights
Force MajeureFMNHAIFIDIC

Why this is different from a generic template

Clause numbers, not vague rights
Cites NHAI GCC Cl. 19 / FIDIC 19.2 directly. Generic templates skip the clause reference and lose the legal anchor.
Indian contract context
Written for NHAI, CPWD, and MoRTH practice. Not a FIDIC document with Indian terminology pasted over it.
Evidence-ready structure
Notice periods, delivery method, and acknowledgement trail built in. Stands up at DRB and arbitration.

Skip the blank page. CivilBolt drafts this with your contract clauses filled in.

Upload your contract and CivilBolt produces a force majeure notice with the right clause references, notice periods, and delivery obligations already populated. Edit the specifics, send it out.