CivilBolt reads the RFP and tells you what it requires, with the clause behind every figure. Then it drafts the bid, and runs the project you win.

or drag it here. PDF, up to 10 files, 100 MB each.

Free. We call to confirm what you need, then send the analysis as a PDF or Excel file, usually the same working day.

The tenderMoRTH · NH-48612 pp
Cl. 40.1 · LD 0.5%/wkfound · p.214 / 612
Cl. 70.3 · EOT

The contracts and codes that run Indian infrastructure

MoRTHNHAICPWDNHIDCLState PWDsFIDICIRCGCC

One platform, from tender to handover. Read the contract, then run the project from it.

See the platform
MoRTH · NH-48612 pp
Cl. 40.1
Risk score
7.2HIGH
Obligations
280

Read the tender before you bid

Risk score, 280 obligations, and pre-bid queries before the go/no-go meeting.

Q1Q2Q3Q4

A schedule that builds itself

Gantt and cost codes, straight from the contract.

Daily log · 14 MaySynced
Manpower · 142
Bitumen · 38 MT
Rain · 2 hrs lost

Field logs from the phone

Manpower, weather, quantities, synced live.

Budget vs actual+6% over
CPI
0.94
SPI
1.02

Overruns caught at week 2

Budget, EVM, and RA-bill tracking.

EOT noticeCl. 40.1
Cl. 40.1

Letters with clause references

EOT, show-cause, and variation drafts.

You

“What does Clause 12.3 say about liquidated damages?”

Civil BrainCl. 12.3 · p.47

LDs capped at ₹50,000/day, maximum 5% of contract value.

Civil Brain answers from your own documents

Ask any clause and get the exact page number, not a generic web answer.

Tender Intelligence

Read a 600-page tender before lunch. Every clause extracted, every risk scored, every obligation tracked, with the page cited.

  • 01Clause extraction
  • 02Risk scoring
  • 03Obligations tracked
  • 04Go / no-go score
  • 05Pre-bid queries
  • 06600+ page intake
See it read a tender
risk · MoRTH NH-48 · 612 pp
Overall risk score
7.2HIGH
16 criteria
6 categories
Liquidated damages · 0.5%/weekFLAG
Payment · 60-day RA cycleFLAG
DLP · 24 monthsOK
Price variation · IS 1239OK

Built for the pace of Indian infrastructure. From the go/no-go meeting to the month-28 arbitration record.

Talk to a construction expert
20 min
to read a 500-page tender
30 sec
from contract to a running project
2 min
to draft a clause-referenced letter

Try it

Set a number you can defend. Drag to estimate, pull away from the bar to dial it in to the cubic metre.

Earthwork quantityprecision ×1
4,08,000
017.14 Cr at ₹420/m³8,00,000

Drag the bar to set the quantity. Pull the cursor away from it for fine control.

Your next project starts with a document, not a blank screen.